Project Info

Site plan, opening date and photos from site since day one

Site Plan

T⁠H⁠E E⁠-⁠S⁠A⁠N G⁠A⁠T⁠E — Site Plan

A 9-rai (≈1.4-hectare) site on Thanarat Road, km.12, split into two zones — the S⁠o⁠f⁠t O⁠p⁠e⁠n⁠i⁠n⁠g opens the M⁠a⁠d⁠e i⁠n K⁠h⁠a⁠o Y⁠a⁠i zone first, with the Halal Village Zone coming soon · tap a building number to see its name, floor area, interior layout and shops.

Tap a pin on the map for details, or filter by type, zone and car route above

Shop line-ups are being added building by building — buildings with a copper tag already have shops or services.

Illustrated 3D site layout of THE E-SAN GATE: the Made in Khao Yai zone at the front with E-SAN Eatery, Dairy Home, Happy Noodle, Korat Chicken on Fire and Hop Beer House Korat, then the car park, restrooms, EV charging, the visitor center, and the Halal Village zone on the hill (coming soon).

S⁠o⁠f⁠t O⁠p⁠e⁠n⁠i⁠n⁠g 13 Nov 2026

  • Mon – Thu07:00 – 20:00
  • Fri – Sun07:00 – 22:00

Drag to pan · use + / − to zoom

Cars enter from Thanarat Road, loop through the car park and leave by the separate exit on the side.

M⁠a⁠d⁠e i⁠n K⁠h⁠a⁠o Y⁠a⁠i Zone

S⁠o⁠f⁠t O⁠p⁠e⁠n⁠i⁠n⁠g 13 Nov 2026

The front of the project — every building and the car park

Halal Village Zone

Coming Soon

The hillside zone

One entrance, plus a separate exit. Cars enter from the entrance into the car park, then leave along the side of the car park onto the main road.

* Positions are approximate and not to scale. Areas are from the preliminary site survey.

Opening Timeline

S⁠o⁠f⁠t O⁠p⁠e⁠n⁠i⁠n⁠g

The first step in opening the gate to Isan — the S⁠o⁠f⁠t O⁠p⁠e⁠n⁠i⁠n⁠g is our initial opening, ahead of the full grand opening.

Add to calendar Google Calendar

Schedule may change.

-- Days
-- Hours
-- Minutes
-- Seconds
  1. 27 Aug

    Site survey

    First walk-through of the land

  2. 4 Oct

    Fit-out begins

    Building fit-out is under way

  3. 13 Nov

    S⁠o⁠f⁠t O⁠p⁠e⁠n⁠i⁠n⁠g

    Initial opening

  4. TBA

    Grand Opening

    Coming soon

Project Journey

From the land as it was, to T⁠h⁠e E⁠-⁠S⁠A⁠N G⁠A⁠T⁠E

This page keeps updating — every time work on site moves forward we add the latest photos here, so operators can follow the change from day one to opening day.

Last updated · 4 Oct 2026

  1. The land as it was

    Exteriors from the first site visit — the entrance, internal roads, mature trees and the existing buildings before work began.

    10 photos · Tap any photo to enlarge

  2. Latest

    Building fit-out begins

    Fit-out is under way — reclaimed timber walls, coloured-glass transoms and the interiors, plus the announcement board at the entrance.

    8 photos · Tap any photo to enlarge

  3. Next update